Designed access scaffold to the existing footbridge, utilising heavy duty beams to both sides of the bridge at high level, with 1 No. lift either side, suspended off the beams, linked together under the bridge, to provide access and encapsulation for bridge repairs.
All works completed within a 12 hour blockade.