Birkenhead Station

Birkenhead Train Station Another successful rail project carried out on behalf of a valued client. This project was to facilitate the canopy refurbishment at Birkenhead Station. All works completed by us were carried out, out of working hours, to allow the station to remain fully open and operational.  All scaffolding for this project has been […]

Bingley Station

Bingley Station We have designed independent access scaffolding for masonry and roofing works at Bingley Station. All works were completed out of hours, to allow the station to remain fully operational during the project.  Heavy duty lanyard rails have been installed above to always allow for safe means of access. We had to maintain full […]

Lune Ford Bridge, Lake District

Lune Ford Footbridge Scaffold now complete on the bridge situated in the heart of the Lake District county side. We worked closely with our client and the EA at design stage, to ensure the scaffold structure was supported off the piers.  All encapsulation complete by Envirowrap and scaffold designed in house. 

Tanners Bank, Newcastle

We were commissioned to undertake the design and installation of a S&T cable support and bridge scaffold at Tanners Bank, Newcastle.    The Scaffold installed on this project will support cables and provide access whilst this rail bridge is being completely removed and rebuilt, whilst allowing the road below to stay open and operational.    […]

Wainwright’s Bridge, Blackburn

We were commissioned to undertake the design and installation of access scaffolding, to facilitate painting works to the 2 main arch spans, along with both parapets over the railway lines.  We successfully designed free standing birdcage scaffolds, built with the arch of the bridge and cantilevered over track with heavy duty beams to provide full access to […]

Penfold Lane, Kent

Designed access scaffold to the existing footbridge, utilising heavy duty beams to both sides of the bridge at high level, with 1 No. lift either side, suspended off the beams, linked together under the bridge, to provide access and encapsulation for bridge repairs.  All works completed within a 12 hour blockade.  

Holyhead Trainshed

Working for our client on their flagship project at Holyhead Train Station in North Wales.  We provided access scaffold to the underside of the full 200m long station roof, along with external scaffold, staircases, loading bays, edge protection and temporary propping works to facilitate essential repair works, to the Grade II listed building, all whilst the station remains fully operational, working both […]

Hawarden Station

Design, supply and installation of a Disability Discrimination Act (DDA) Compliant Pedestrian Temporary Footbridge at Hawarden Station, North Wales.  The footbridge was installed to enable the existing footbridge to be taken out of use, to allow our client to carry out essential repairs off-site, whilst keeping the station fully operational. 

Gauxholme Viaduct

Essential refurbishments works were carried out to the 181 year old, Grade II listed Gauxholme Viaduct, situated in the market town of Todmorden, West Yorkshire in 2020/2021.  We were commissioned to fully design and develop an access solution to facilitate blasting and painting works, along with steel and strengthening repairs to the main span over the canal, […]