41 Spring Gardens

Spring Gardens is an important thoroughfare set in the heart of Manchester City Centre, currently occupied by a number of businesses.  With several Grade II listed buildings, the area forms part of the Upper King Street Conservation Area.  We provided a fully designed, sheeted independent access scaffold for our client, to enable them to carry […]

Wainwright’s Bridge, Blackburn

We were commissioned to undertake the design and installation of access scaffolding, to facilitate painting works to the 2 main arch spans, along with both parapets over the railway lines.  We successfully designed free standing birdcage scaffolds, built with the arch of the bridge and cantilevered over track with heavy duty beams to provide full access to […]

Penfold Lane, Kent

Designed access scaffold to the existing footbridge, utilising heavy duty beams to both sides of the bridge at high level, with 1 No. lift either side, suspended off the beams, linked together under the bridge, to provide access and encapsulation for bridge repairs.  All works completed within a 12 hour blockade.  

Holyhead Trainshed

Working for our client on their flagship project at Holyhead Train Station in North Wales.  We provided access scaffold to the underside of the full 200m long station roof, along with external scaffold, staircases, loading bays, edge protection and temporary propping works to facilitate essential repair works, to the Grade II listed building, all whilst the station remains fully operational, working both […]

Hawarden Station

Design, supply and installation of a Disability Discrimination Act (DDA) Compliant Pedestrian Temporary Footbridge at Hawarden Station, North Wales.  The footbridge was installed to enable the existing footbridge to be taken out of use, to allow our client to carry out essential repairs off-site, whilst keeping the station fully operational. 

Gamble Building

Full perimeter, fully boarded access scaffold installed with goods hoist and fully monarflex sheeted, to enable our client to carry out refurbishment works to the building.   

Leigh Town Hall

Engaged by our client to provide full designed access scaffold to carry out major refurbishment works to both the internal and external, along with a new build extension to the beautiful Grade II listed building. Situated in the busy town centre, we installed access scaffold to the full external, including all chimneys and turrets, loading […]

Gauxholme Viaduct

Essential refurbishments works were carried out to the 181 year old, Grade II listed Gauxholme Viaduct, situated in the market town of Todmorden, West Yorkshire in 2020/2021.  We were commissioned to fully design and develop an access solution to facilitate blasting and painting works, along with steel and strengthening repairs to the main span over the canal, […]

Industrial Units

Working with a number of contractors throughout the North West, we engage in a variety of industrial unit projects and again have become the contractor of choice in providing scaffolding and safety netting, becoming a key supplier to many roofing, cladding and building contractors over the years, supplying them with the following: • Access Scaffold • […]

Astley Hall

Set in Chorley’s Astley Park, the hall is a Grade I listed building, which houses a museum and art gallery, and was the venue for 2021’s G7 Summit, hosted by Commons Speaker, Sir Lindsay Hoyle.  We were engaged by our client to provide full access to the hall and cottage, providing full perimeter access scaffolding and a fully sheeted temporary roof […]