Nazeing New Road, London- A free standing service bridge with contractor access.
With the bridge section spanning 20m, we used heavy duty 1.3m Apollo beams. This provided its own problem as the scaffold had to sit directly above an existing OLE gantry. This was craned into position with expert precision within a blockade. Each side was clad with 1.8m high marine ply boarding.
This London based project was to facilitate the temporary diversion of the footpath, whilst the bridge removal and reconstruction takes place. We specialise in the design and installation of pedestrian footbridges within the rail environment, with extensive experience in the design and delivery of these projects.