Full designed access scaffold installed at floor levels, fully boarded, complete with staircase and hoist to Moorcot Court, along with heavy duty designed hoist gantry scaffold installed around the perimeter of Brooksway Court.
Both residential blocks were erected simultaneously, with both being fully occupied throughout the project.