We were commissioned to undertake the design and installation of access scaffolding, to facilitate painting works to the 2 main arch spans, along with both parapets over the railway lines.
We successfully designed free standing birdcage scaffolds, built with the arch of the bridge and cantilevered over track with heavy duty beams to provide full access to the works areas.
A challenging project working with traffic management on a live highway and directly above a live train line, the project was completed working on both night and daytime shifts.
The height of the arches, restrictions on loading and with width restrictions, due to traffic management, presented a design and operational challenge, successfully overcome by both the design and operation team.